116 citations · 483 across the 16 of their papers we have counts for
Showing 2020Show all
2 papers · 1 filter
physics.ins-det2020★ 17 cited
Synchronisation and calibration of the 24-modules J-PET prototype with 300~mm axial field of view
P. Moskal, T. Bednarski, Sz. Niedzwiecki +36
Research conducted in the framework of the J-PET project aims to develop a cost-effective total-body positron emission tomography scanner. As a first step on the way to construct a…
physics.ins-det2020
Hit-time and hit-position reconstruction in strips of plastic scintillators using multi-threshold readouts
N. G. Sharma, M. Silarski, J. Chhokar +32
In this article, a new method for the reconstruction of hit-position and hit-time of photons in long scintillator detectors is investigated. This research is motivated by the recen…