activity
20202022
most citedCharacterization of the CMS Endcap Timing Layer readout chip prototype with charge injection

12 citations · 27 across the 9 of their papers we have counts for

collaborators

10 papers

physics.ins-det2022

A 40 Gbps Optical Transceiver for Particle Physics Experiments

B. Deng, X. Huang, H. Sun +12

We present the design and the test results of a quad-channel optical transceiver module (QTRx) possibly for future particle physics experiments. The transmitters of QTRx, each at 1…

physics.ins-det2022

A prototype optical link board with redundancy design for the ATLAS liquid argon calorimeter Phase-2 upgrade

X. Huang, C. Liu, A. Deiana +9

A prototype optical-link board has been developed for the ATLAS Liquid Argon Calorimeter Phase-2 upgrade. The board consists of 24 lpGBT chips and 8 VTRx+ modules and demonstrates…

physics.ins-det20214 cited

In-pixel automatic threshold calibration for the CMS Endcap Timing Layer readout chip

H. Sun, D. Gong, C. Edwards +10

We present the implementation and verification of an in-pixel automatic threshold calibration circuit for the CMS Endcap Timing Layer (ETL) in the High-Luminosity LHC upgrade. The…

physics.ins-det2021

Quality control tests of the front-end optical link components for the ATLAS Liquid Argon Calorimeter Phase-1 upgrade

B. Deng, J. Thomas, L. Zhang +28

We present the procedures and results of the quality control tests for the front-end optical link components in the ATLAS Liquid Argon Calorimeter Phase-1 upgrade. The components i…

physics.ins-det20212 cited

Characterization and quality control test of a gigabit cable receiver ASIC (GBCR2) for the ATLAS Inner Tracker Detector upgrade

W. Zhang, C. Chen, D. Gong +10

We present the characterization and quality control test of a gigabit cable receiver ASIC prototype, GBCR2, for the ATLAS Inner Tracker pixel detector upgrade. GBCR2 equalizes and…

physics.ins-det202112 cited

Characterization of the CMS Endcap Timing Layer readout chip prototype with charge injection

H. Sun, D. Gong, W. Zhang +10

We present the characterization of a readout Application-Specific Integrated Circuit (ASIC) for the CMS Endcap Timing Layer (ETL) of the High-Luminosity LHC upgrade with charge inj…