activity
20162026
most citedDecentralized Abstractions and Timed Constrained Planning of a General Class of Coupled Multi-Agent Systems

3 citations · 6 across the 12 of their papers we have counts for

collaborators
Showing 2019Show all

5 papers · 1 filter

cs.RO2019

Results from the Robocademy ITN: Autonomy, Disturbance Rejection and Perception for Advanced Marine Robotics

Matias Valdenegro-Toro, Mariela De Lucas Alvarez, Mariia Dmitrieva +7

Marine and Underwater resources are important part of the economy of many countries. This requires significant financial resources into their construction and maintentance. Robotic…

cs.RO2019

Robust Trajectory Tracking Control for Underactuated Autonomous Underwater Vehicles

Shahab Heshmati-alamdari, Alexandros Nikou, Dimos V. Dimarogonas

Motion control of underwater robotic vehicles is a demanding task with great challenges imposed by external disturbances, model uncertainties and constraints of the operating works…

cs.RO2019

A Distributed Predictive Control Approach for Cooperative Manipulation of Multiple Underwater Vehicle Manipulator Systems

Shahab Heshmati-Alamdari, George C. Karras, Kostas J. Kyriakopoulos

This paper addresses the problem of cooperative object transportation for multiple Underwater Vehicle Manipulator Systems (UVMSs) in a constrained workspace involving static obstac…

cs.RO2019

Decentralized Impedance Control for Cooperative Manipulation of Multiple Underwater Vehicle Manipulator Systems under Lean Communication

Shahab Heshmati-alamdari, Charalampos P. Bechlioulis, George C. Karras +1

This paper addresses the problem of cooperative object transportation for multiple Underwater Vehicle Manipulator Systems (UVMSs) in a constrained workspace with static obstacles,…

eess.SY2019

Design and Experimental Validation of Tube-based MPC for Timed-constrained Robot Planning

Alexandros Nikou, Shahab Heshmati-alamdari, Dimos V. Dimarogonas

This paper deals with the design and experimental validation of a state-of-the art tube-based Model Predictive Control (MPC) for achieving time-constrained tasks. Given the uncerta…