4 citations · 6 across the 3 of their papers we have counts for
5 papers · 1 filter
Commissioning and first results of the Electron Beam Profiler in the Main Injector at Fermilab
R. Thurman-Keup, M. Alvarez, J. Fitzgerald +4
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging an…
Installation status of the electron beam profiler for the Fermilab Main Injector
R. Thurman-Keup, M. Alvarez, J. Fitzgerald +5
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging an…
Beam Position Monitor Electronics Upgrade for Fermilab Switchyard
P. Stabile, J. S. Diamond, J. A. Fitzgerald +4
The beam position monitor (BPM) system for Fermilab Switchyard (SY) provides the position, intensity and integrated intensity of the 53.10348 MHz RF bunched resonant extracted beam…
Operation of the Intensity Monitors in Beam Transport Lines at Fermilab During Run II
J. Crisp, B. Fellenz, J. Fitzgerald +2
The intensity of charged particle beams at Fermilab must be kept within pre-determined safety and operational envelopes in part by assuring all beam within a few percent has been t…
Operational aspects of the Main Injector large aperture quadrupole (WQB)
W. Chou, L. Bartelson, B. Brown +18
A two-year Large Aperture Quadrupole (WQB) Project was completed in the summer of 2006 at Fermilab. Nine WQBs were designed, fabricated and bench-tested by the Technical Division.…