activity
20082018
most citedOperation of the Intensity Monitors in Beam Transport Lines at Fermilab During Run II

4 citations · 6 across the 3 of their papers we have counts for

collaborators

5 papers

physics.acc-ph2018★ 2 cited

Commissioning and first results of the Electron Beam Profiler in the Main Injector at Fermilab

R. Thurman-Keup, M. Alvarez, J. Fitzgerald +4

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging an…

physics.acc-ph2015

Installation status of the electron beam profiler for the Fermilab Main Injector

R. Thurman-Keup, M. Alvarez, J. Fitzgerald +5

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging an…

physics.acc-ph2015

Beam Position Monitor Electronics Upgrade for Fermilab Switchyard

P. Stabile, J. S. Diamond, J. A. Fitzgerald +4

The beam position monitor (BPM) system for Fermilab Switchyard (SY) provides the position, intensity and integrated intensity of the 53.10348 MHz RF bunched resonant extracted beam…

physics.acc-ph2012★ 4 cited

Operation of the Intensity Monitors in Beam Transport Lines at Fermilab During Run II

J. Crisp, B. Fellenz, J. Fitzgerald +2

The intensity of charged particle beams at Fermilab must be kept within pre-determined safety and operational envelopes in part by assuring all beam within a few percent has been t…

physics.acc-ph2008

Operational aspects of the Main Injector large aperture quadrupole (WQB)

W. Chou, L. Bartelson, B. Brown +18

A two-year Large Aperture Quadrupole (WQB) Project was completed in the summer of 2006 at Fermilab. Nine WQBs were designed, fabricated and bench-tested by the Technical Division.…