32 citations · 66 across the 20 of their papers we have counts for
3 papers · 1 filter
Operation of the H- Linac at FNAL
K. Seiya, T. Butler, D. Jones +11
The Fermi National Accelerator Laboratory (FNAL) Linac has been in operation for 52 years. In approximately four years, it will be replaced by a new 800 MeV superconducting machine…
Synchronous High-frequency Distributed Readout For Edge Processing At The Fermilab Main Injector And Recycler
J. R. Berlioz, M. R. Austin, J. M. Arnold +17
The Main Injector (MI) was commissioned using data acquisition systems developed for the Fermilab Main Ring in the 1980s. New VME-based instrumentation was commissioned in 2006 for…
FNAL PIP-II Accumulator Ring
William Pellico, Chandra Bhat, Jeffrey Eldred +6
The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the…