32 citations · 66 across the 20 of their papers we have counts for
6 papers · 1 filter
The Fermilab Main Injector: high intensity operation and beam loss control
Bruce C. Brown, Philip Adamson, David Capista +6
From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with im…
6 Batch Injection and Slipped Beam Tune Measurements in Fermilab's Main Injector
D. J. Scott, D. Capista, I. Kourbanis +2
During Nova operations it is planned to run the Fermilab Recycler in a 12 batch slip stacking mode. In preparation for this, measurements of the tune during a six batch injection a…
Coalescing at 8 GeV in the Fermilab Main Injector
D. J. Scott, D. Capista, B. Chase +4
For Project X, it is planned to inject a beam of 3 10**11 particles per bunch into the Main Injector. To prepare for this by studying the effects of higher intensity bunches in the…
Momentum Cogging at the Fermilab Booster
K. Seiya, C. Drennan, W. A. Pellico +2
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour which is almost double the current operat…
Alignment and Aperture Scan at the Fermilab Booster
K. Seiya, J. Lackey, W. Marsh +4
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current opera…
Single/Few Bunch Space Charge Effects at 8-GeV in the Fermilab Main Injector
D. J. Scott, D. Capista, I. Kourbanis +2
For Project X, it is planned to inject a beam of 3x10**11 particles per bunch into the Main Injector. Therefore, at 8-GeV, there will be increased space charge tune shifts and an i…