physics.acc-ph2023
Installation, commissioning, and testing of the HB650 CM at PIP2IT
M White, J Makara, S Ranpariya +10
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LI…
physics.acc-ph2023
The Evaluation of Mechanical Properties of LB650 Cavities
J. Holzbauer, G. Wu, H. Park +13
The PIP-II project's LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical prope…
physics.acc-ph2023
Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab
J. Helsper, S. Chandrasekaran, J. Holzbauer +1
The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the inter…