33 citations · 60 across the 5 of their papers we have counts for
8 papers
High accuracy, high resolution 235U(n,f) cross section from n_TOF (CERN) in the thermal to 10 keV energy range
TOF collaboration, M. Mastromarco, S. Amaducci +119
The 235U(n,f) cross section was measured in a wide energy range (25 meV - 170 keV) at the n_TOF facility at CERN, relative to 6Li(n,t) and 10B(n,alpha) standard reactions, with hig…
Measurement of the neutron flux at the Canfranc Underground Laboratory with HENSA
S. E. A. Orrigo, J. L. Tain, N. Mont-Geli +14
We have performed a long-term measurement of the neutron flux with the High Efficiency Neutron Spectrometry Array HENSA in the Hall A of the Canfranc Underground Laboratory. The Ha…
First results from the HENSA/ANAIS collaboration at the Canfranc Underground Laboratory
N Mont-Geli, A Tarifeño-Saldivia, S E A Orrigo +24
The HENSA/ANAIS collaboration aims for the precise determination of the neutron flux that could affect ANAIS-112, an experiment looking for the dark matter annual modulation using…
Imaging neutron capture cross sections: i-TED proof-of-concept and future prospects based on Machine-Learning techniques
V. Babiano-Suárez, J. Lerendegui-Marco, J. Balibrea-Correa +132
i-TED is an innovative detection system which exploits Compton imaging techniques to achieve a superior signal-to-background ratio in () cross-section measurements using time-…
Review and new concepts for neutron-capture measurements of astrophysical interest
C. Domingo-Pardo, V. Babiano-Suarez, J. Balibrea-Correa +128
The idea of slow-neutron capture nucleosynthesis formulated in 1957 triggered a tremendous experimental effort in different laboratories worldwide to measure the relevant nuclear p…
Experimental setup and procedure for the measurement of the 7Be(n,p)7Li reaction at n_TOF
M. Barbagallo, J. Andrzejewski, M. Mastromarco +125
Following the completion of the second neutron beam line and the related experimental area (EAR2) at the n_TOF spallation neutron source at CERN, several experiments were planned a…