activity
20162025
most citedConstraint on the Matter-Antimatter Symmetry-Violating Phase in Neutrino Oscillations

374 citations · 1.4k across the 30 of their papers we have counts for

collaborators
Showing physics.ins-detShow all

6 papers · 1 filter

physics.ins-det2022

Scintillator ageing of the T2K near detectors from 2010 to 2021

The T2K Collaboration, K. Abe, N. Akhlaq +355

The T2K experiment widely uses plastic scintillator as a target for neutrino interactions and an active medium for the measurement of charged particles produced in neutrino interac…

physics.ins-det2020★ 8 cited

Study of scintillation light collection, production and propagation in a 4 tonne dual-phase LArTPC

B. Aimard, L. Aizawa, C. Alt +160

The m demonstrator is a dual phase liquid argon time projection chamber that has recorded cosmic rays events in 2017 at CERN. The light signal in these de…

physics.ins-det2019★ 14 cited

J-PARC Neutrino Beamline Upgrade Technical Design Report

K. Abe, H. Aihara, A. Ajmi +381

In this document, technical details of the upgrade plan of the J-PARC neutrino beamline for the extension of the T2K experiment are described. T2K has proposed to accumulate data c…

physics.ins-det2018★ 25 cited

A 4 tonne demonstrator for large-scale dual-phase liquid argon time projection chambers

B. Aimard, Ch. Alt, J. Asaadi +169

A 10 kilo-tonne dual-phase liquid argon TPC is one of the detector options considered for the Deep Underground Neutrino Experiment (DUNE). The detector technology relies on amplifi…

physics.ins-det2017

The Single-Phase ProtoDUNE Technical Design Report

B. Abi, R. Acciarri, M. A. Acero +824

ProtoDUNE-SP is the single-phase DUNE Far Detector prototype that is under construction and will be operated at the CERN Neutrino Platform (NP) starting in 2018. ProtoDUNE-SP, a cr…

physics.ins-det2016★ 11 cited

First test of a high voltage feedthrough for liquid Argon TPCs connected to a 300 kV power supply

C. Cantini, A. Gendotti, L. Molina Bueno +8

Voltages above a hundred kilo-volt will be required to generate the drift field of future very large liquid Argon Time Projection Chambers. The most delicate component is the feedt…