paper

CMS RPC Activities During LHC LS-2

arXiv:2005.12534 · doi:10.1088/1748-0221/15/10/C10025

Abstract

The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade, namely RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.

5 pages, 5 figures, 15th Workshop on Resistive Plate Chambers and related detectors (RPC2020) Roma, Italy

References in corpus (1)