A critical path approach for elucidating the temperature dependence of granular hopping conduction
arXiv:1907.12190 · doi:10.1007/s11467-018-0814-y
Abstract
We revisit the classical problem of granular hopping conduction's temperature dependence, and offer a straightforward and simple explanation on a phenomenon that was widely observed over diverse material systems, but which has remained a puzzle in spite of the various efforts for its explanation.
References in corpus (5)
- Coulomb effects in granular materials at not very low temperatures
- Density of States and Conductivity of Granular Metal or Array of Quantum Dots
- Coulomb effects and hopping transport in granular metals
- Variable-range-hopping conduction processes in oxygen deficient polycrystalline ZnO films
- Variable range cotunneling and conductivity of a granular metal