Abstract
We consider a project that consists of a set of activities performed in parallel under constraints on their start and finish times, including start-finish precedence relationships, release start times, release end times, and deadlines. The problems of interest are to decide on the optimal schedule of the activities to minimize both the maximum flow-time over all activities, and the project makespan. We formulate these problems as bi-objective optimization problems in the framework of tropical mathematics which investigates the theory and applications of algebraic systems with idempotent operations and has various applications in management science and operations research. Then, the use of methods and techniques of tropical optimization allows to derive complete Pareto-optimal solutions of the problems in a direct explicit form ready for further analysis and straightforward computation. We discuss the computational complexity of the solution and give illustrative examples.
arXiv comment29 pages, 2 figures
References in corpus (8)
- Extremal properties of tropical eigenvalues and solutions to tropical optimization problems
- A multidimensional tropical optimization problem with nonlinear objective function and linear constraints
- A constrained tropical optimization problem: complete solution and application example
- Tropical optimization problems with application to project scheduling with minimum makespan
- Direct solution to constrained tropical optimization problems with application to project scheduling
- Tropical optimization problems
- Tropical optimization problems in time-constrained project scheduling
- Using tropical optimization techniques in bi-criteria decision problems