activity
19942026
most citedMeasurement of the J/Psi Meson and b-Hadron Production Cross Sections in ppbar Collisions at sqrt s = 1960 GeV

699 citations · 7.7k across the 168 of their papers we have counts for

collaborators
Showing physics.ins-detShow all

6 papers · 1 filter

physics.ins-det2020★ 23 cited

Supernova neutrino detection in NOvA

NOvA Collaboration, M. A. Acero, P. Adamson +199

The NOvA long-baseline neutrino experiment uses a pair of large, segmented, liquid-scintillator calorimeters to study neutrino oscillations, using GeV-scale neutrinos from the Ferm…

physics.ins-det2019★ 15 cited

Observation of seasonal variation of atmospheric multiple-muon events in the NOvA Near Detector

M. A. Acero, P. Adamson, L. Aliaga +188

Using two years of data from the NOvA Near Detector at Fermilab, we report a seasonal variation of cosmic ray induced multiple-muon event rates which has an opposite phase to the s…

physics.ins-det2017

The Single-Phase ProtoDUNE Technical Design Report

B. Abi, R. Acciarri, M. A. Acero +824

ProtoDUNE-SP is the single-phase DUNE Far Detector prototype that is under construction and will be operated at the CERN Neutrino Platform (NP) starting in 2018. ProtoDUNE-SP, a cr…

physics.ins-det2016★ 98 cited

Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) Conceptual Design Report Volume 1: The LBNF and DUNE Projects

R. Acciarri, M. A. Acero, M. Adamowski +795

This document presents the Conceptual Design Report (CDR) put forward by an international neutrino community to pursue the Deep Underground Neutrino Experiment at the Long-Baseline…

physics.ins-det2015★ 302 cited

A Proposal for a Three Detector Short-Baseline Neutrino Oscillation Program in the Fermilab Booster Neutrino Beam

R. Acciarri, C. Adams, R. An +221

A Short-Baseline Neutrino (SBN) physics program of three LAr-TPC detectors located along the Booster Neutrino Beam (BNB) at Fermilab is presented. This new SBN Program will deliver…

physics.ins-det2009★ 12 cited

Performance studies of the CMS Strip Tracker before installation

CMS Tracker Collaboration

In March 2007 the assembly of the Silicon Strip Tracker was completed at the Tracker Integration Facility at CERN. Nearly 15% of the detector was instrumented using cables, fiber o…