7 citations · 31 across the 18 of their papers we have counts for
18 papers
Beam Dynamics simulations for ERDC project -- SRF linac for industrial use
N. Solyak, I. Gonin, A. Saini +5
Compact conductively cooled SRF industrial linacs can provide unique parameters of the electron beam for industrial applications. (up to 10MeV, 1MW). For ERDC project we designed n…
Gridded RF Gun Design for SRF Linac Applications
I. Gonin, C. Edwards, S. Kazakov +8
The thermionic gridded gun is described which generates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavi…
Final Physics Design of Proton Improvement Plan-II At Fermilab
Abhishek Pathak, Arun Saini, Eduard Pozdeyev
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We addre…
An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade
D. Neuffer, S. Belomestnykh, M. Checchin +7
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron…
Beam Dynamics Studies at the PIP-II Injector Test Facility
J. -P. Carneiro, B. Hanna, E. Podzeyev +3
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-I…
An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade: a Snowmass 2021 White Paper
S. Belomestnykh, M. Checchin, D. Johnson +8
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermila…
Design of a medium energy, high average power superconducting e-beam accelerator for environmental applications
R. C. Dhuley, I. Gonin, K. Zeller +10
We present the technical and engineering design of a medium energy (10 MeV) and high average power (1 MW) electron beam accelerator intended for irradiation treatment of high volum…
Ring-Based Electron Cooling System for the EIC
V. Lebedev, S. Nagaitsev, A. Burov +5
This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of p…
Measurements of a 2.1 MeV H beam with an Allison scanner
C. Richard, J. -P. Carneiro, B. Hanna +4
Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design,…
Experience with Long-pulse Operation of the PIP2IT Warm Front End
A. Shemyakin, J. -P. Carneiro, A. Chen +10
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) lin…
Experimental Study of Beam Dynamics In The PIP-II MEBT Prototype
A. Shemyakin, J. -P. Carneiro, B. Hanna +6
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototy…
PIP-II Injector Test Warm Front End: Commissioning Update
L. Prost, R. Andrews, C. Baffes +19
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…
Status of the warm front end of PIP-II injector test
A. Shemyakin, M. Alvarez, R. Andrews +15
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF…
Characterization of the beam from the RFQ of the PIP-II Injector Test
A. Shemyakin, J. -P. Carneiro, B. Hanna +5
A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at Fermilab's test accelerator known as PIP-II Injector Test. This report describes the measurements of the beam propert…
Transmission efficiency measurement at the FNAL 4-rod RFQ
J. -P. Carneiro, F. G. Garcia, J. -F Ostiguy +4
This paper presents measurements of the beam transmission performed on the 4-rod RFQ currently under operation at Fermilab. The beam current has been measured at the RFQ exit as a…
Untrapped HOM Radiation Absorption in the LCLS-II Cryomodules
K. Bane, C. Nantista, C. Adolphsen +4
The superconducting cavities in the continuous wave (CW) linacs of LCLS-II are designed to operate at 2 K, where cooling costs are very expensive. One source of heat is presented b…
Study of effects of failure of beamline elements and their compensation in CW superconducting linac
A. Saini, K. Ranjan, N. Solyak +2
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. First stage of the Project-X consists of superconducting linac which will be operated in conti…
Calculation of acceptance of high intensity superconducting proton linac for Project X
A. Saini, K. Ranjan, N. Solyak +2
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in cont…