activity
20172022
most citedCherenkov Telescope Array Contributions to the 35th International Cosmic Ray Conference (ICRC2017)

3 citations · 5 across the 3 of their papers we have counts for

collaborators

5 papers

cs.NI20222 cited

First electrical White Rabbit absolute calibration inter-comparison

P. P. M. Jansweijer, N. A. D. Boukadida, K. Hanhijärvi +3

A time transfer link consisting of PTP White Rabbit (PTP-WR) devices can transfer time with sub-nanosecond accuracy. Originally White Rabbit devices were calibrated as a set of two…

physics.ins-det2021

The Calibration Units of KM3NeT

R. Le Breton, M. Billault, C. Boutonnet +16

KM3NeT is a deep-sea infrastructure composed of two neutrino telescopes being deployed in the Mediterranean Sea: ARCA, near Sicily in Italy, designed for neutrino astronomy, and OR…

astro-ph.IM2019

KM3NeT front-end and readout electronics system: hardware, firmware and software

The KM3NeT Collaboration, S. Aiello, F. Ameli +237

The KM3NeT research infrastructure being built at the bottom of the Mediterranean Sea will host water-Cherenkov telescopes for the detection of cosmic neutrinos. The neutrino teles…

physics.optics2018

Measurement of optical to electrical and electrical to optical delays with ps-level uncertainty

H. Z. Peek, T. J. Pinkert, P. P. M. Jansweijer +1

We present a new measurement principle to determine the absolute time delay of a waveform from an optical reference plane to an electrical reference plane and vice versa. We demons…

astro-ph.HE20173 cited

Cherenkov Telescope Array Contributions to the 35th International Cosmic Ray Conference (ICRC2017)

F. Acero, B. S. Acharya, V. Acín Portella +1137

List of contributions from the Cherenkov Telescope Array Consortium presented at the 35th International Cosmic Ray Conference, July 12-20 2017, Busan, Korea.