48 citations · 77 across the 3 of their papers we have counts for
4 papers · 1 filter
A primary electron beam facility at CERN -- eSPS Conceptual design report
M. Aicheler, T. Akesson, F. Antoniou +52
The design of a primary electron beam facility at CERN is described. The study has been carried out within the framework of the wider Physics Beyond Colliders study. It re-enables…
A primary electron beam facility at CERN
T. Åkesson, R. Corsini, Y. Dutheil +6
This paper describes the concept of a primary electron beam facility at CERN, to be used for dark gauge force and light dark matter searches. The electron beam is produced in three…
A primary electron beam facility at CERN
T. Åkesson, Y. Dutheil, L. Evans +3
This document describes the concept of a primary electron beam facility at CERN, to be used for dark gauge force and light dark matter searches. The electron beam is produced in th…
The International Linear Collider Machine Staging Report 2017
Lyn Evans, Shinichiro Michizono
The Technical Design Report (TDR) of the ILC mainly concentrates on a baseline machine of 500 GeV centre-of-mass with detailed cost and manpower estimates consistent with this opti…