3 papers
physics.acc-ph2025
Test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies for the High Luminosity LHC upgrade
G. Chlachidze, G. Ambrosio, M. Anerella +13
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC up…
physics.acc-ph2025
Oakridge PPU Magnets: Results and Measurements
J. DiMarco, D. Harding, V. Kashikhin +8
The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upg…
physics.acc-ph2025
The 2025 Roadmaps for the US Magnet Development Program
Lance Cooley, Paolo Ferracin, Steve Gourlay +21
The US Physics community completed the Snowmass planning process in 2022, culminating in the HEPAP Particle Physics Project Prioritization Panel (P5) publishing its summary report…