1 citations · 1 across the 7 of their papers we have counts for
7 papers
Latest Development of Electropolishing Optimization for 650 MHz Niobium Cavity
V. Chouhan, D. Bice, D. Burk +15
Electropolishing (EP) of 1.3 GHz niobium superconducting RF cavities is conducted to achieve a desired smooth and contaminant-free surface that yields good RF performance. Achievin…
Impact of Solenoid Induced Residual Magnetic Fields on The Prototype SSR1 CM Performance
D. Passarelli, J. Bernardini, C. Boffo +11
A prototype cryomodule containing eight Single Spoke Resonators type-1 (SSR1) operating at 325 MHz and four superconducting focusing lenses was successfully assembled, cold tested,…
PIII Project Overview and Status
R. Stanek, C. Boffo, S. Chandrasekaran +9
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE an…
Installation, commissioning, and testing of the HB650 CM at PIP2IT
M White, J Makara, S Ranpariya +10
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LI…
The Evaluation of Mechanical Properties of LB650 Cavities
J. Holzbauer, G. Wu, H. Park +13
The PIP-II project's LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical prope…
Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab
J. Helsper, S. Chandrasekaran, J. Holzbauer +1
The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the inter…