activity
20162024
most citedPIII Project Overview and Status

1 citations · 1 across the 7 of their papers we have counts for

collaborators

7 papers

physics.acc-ph2024

Latest Development of Electropolishing Optimization for 650 MHz Niobium Cavity

V. Chouhan, D. Bice, D. Burk +15

Electropolishing (EP) of 1.3 GHz niobium superconducting RF cavities is conducted to achieve a desired smooth and contaminant-free surface that yields good RF performance. Achievin…

physics.acc-ph2024

Impact of Solenoid Induced Residual Magnetic Fields on The Prototype SSR1 CM Performance

D. Passarelli, J. Bernardini, C. Boffo +11

A prototype cryomodule containing eight Single Spoke Resonators type-1 (SSR1) operating at 325 MHz and four superconducting focusing lenses was successfully assembled, cold tested,…

physics.acc-ph20231 cited

PIII Project Overview and Status

R. Stanek, C. Boffo, S. Chandrasekaran +9

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE an…

physics.acc-ph2023

Installation, commissioning, and testing of the HB650 CM at PIP2IT

M White, J Makara, S Ranpariya +10

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LI…

physics.acc-ph2023

The Evaluation of Mechanical Properties of LB650 Cavities

J. Holzbauer, G. Wu, H. Park +13

The PIP-II project's LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical prope…

physics.acc-ph2023

Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab

J. Helsper, S. Chandrasekaran, J. Holzbauer +1

The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the inter…