activity
20162020
most citedDistributionally Robust Facility Location Problem under Decision-dependent Stochastic Demand

21 citations · 25 across the 4 of their papers we have counts for

collaborators

12 papers

math.OC2020

Distributionally Robust Bottleneck Combinatorial Problems: Uncertainty Quantification and Robust Decision Making

Weijun Xie, Jie Zhang, Shabbir Ahmed

This paper studies data-driven distributionally robust bottleneck combinatorial problems (DRBCP) with stochastic costs, where the probability distribution of the cost vector is con…

math.CO20201 cited

A Simulated Annealing Algorithm for the Directed Steiner Tree Problem

Matias Siebert, Shabbir Ahmed, George Nemhauser

In \cite{siebert2019linear} the authors present a set of integer programs (IPs) for the Steiner tree problem, which can be used for both, the directed and the undirected setting of…

math.OC202021 cited

Distributionally Robust Facility Location Problem under Decision-dependent Stochastic Demand

Beste Basciftci, Shabbir Ahmed, Siqian Shen

Facility location decisions significantly impact customer behavior and consequently the resulting demand in a wide range of businesses. Furthermore, sequentially realized uncertain…

math.OC2019

Efficient Algorithms for Distributionally Robust Stochastic Optimization with Discrete Scenario Support

Zhe Zhang, Shabbir Ahmed, Guanghui Lan

Recently, there has been a growing interest in distributionally robust optimization (DRO) as a principled approach to data-driven decision making. In this paper, we consider a dist…

math.OC2019

Exact Augmented Lagrangian Duality for Mixed Integer Quadratic Programming

Xiaoyi Gu, Shabbir Ahmed, Santanu S. Dey

Mixed integer quadratic programming (MIQP) is the problem of minimizing a convex quadratic function over mixed integer points in a rational polyhedron. This paper focuses on the au…

math.OC20193 cited

Two-stage Stochastic Lot-sizing Problem with Chance-constrained Condition in the Second Stage

Zeyang Zhang, Chuanhou Gao, Shabbir Ahmed

In a given production planning horizon, the demands may only be comfirmed in part of the whole periods, and the others are uncertain. In this paper, we consider a two-stage stochas…