activity
20152026
most citedPerformance of missing transverse momentum reconstruction with the ATLAS detector using proton-proton collisions at = 13 TeV

331 citations · 1.6k across the 34 of their papers we have counts for

collaborators
Showing physics.ins-detShow all

6 papers · 1 filter

physics.ins-det2021★ 2 cited

Track reconstruction and matching between emulsion and silicon pixel detectors for the SHiP-charm experiment

SHiP Collaboration

In July 2018 an optimization run for the proposed charm cross section measurement for SHiP was performed at the CERN SPS. A heavy, moving target instrumented with nuclear emulsion…

physics.ins-det2021

The SHiP experiment at the proposed CERN SPS Beam Dump Facility

SHIP Collaboration

The Search for Hidden Particles (SHiP) Collaboration has proposed a general-purpose experimental facility operating in beam-dump mode at the CERN SPS accelerator to search for ligh…

physics.ins-det2020★ 18 cited

SND@LHC

SHiP Collaboration, C. Ahdida, A. Akmete +341

We propose to build and operate a detector that, for the first time, will measure the process at the LHC and search for feebly interacting particles (FIPs) in an unexplor…

physics.ins-det2020★ 3 cited

Measurement of the muon flux for the SHiP experiment

SHiP Collaboration

The SHiP experiment will search for very weakly interacting particles beyond the Standard Model which are produced in a 400 \GeV/ proton beam dump at the CERN SPS. About $10^{11…

physics.ins-det2019★ 12 cited

Beam impact tests of a prototype target for the Beam Dump Facility at CERN: experimental setup and preliminary analysis of the online results

E. Lopez Sola, M. Calviani, O. Aberle +24

The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first ai…

physics.ins-det2018★ 11 cited

Design Development for the Beam Dump Facility Target Complex at CERN

K. Kershaw, J. -L. Grenard, M. Calviani +10

CERN has launched a study phase to evaluate the feasibility of a new high-intensity beam dump facility at the CERN Super Proton Synchrotron accelerator with the primary goal of exp…