2 papers
physics.acc-ph2025
Mechanical Design of the PIP-II ORBUMP Pulsed Dipole Magnet
D. Karas, K. Badgley, Z. Chen +9
The Proton Improvement Plan II (PIP-II) project is a vital upgrade to the Fermilab accelerator complex. The magnet pulse rate of the PIP-II Injection system requires an increase fr…
physics.acc-ph2025
Magnetic measurements of Fermilab rapid-cycling Booster gradient magnets
J. DiMarco, D. Assell, T. Cummings +8
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve…