6 citations · 22 across the 6 of their papers we have counts for
4 papers · 1 filter
Installation status of the electron beam profiler for the Fermilab Main Injector
R. Thurman-Keup, M. Alvarez, J. Fitzgerald +5
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging an…
Pxie low energy beam transport commissioning
L. Prost, M. Alvarez, R. Andrews +6
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- supe…
Third generation residual gas ionization profile monitors at Fermilab
J. R. Zagel, M. Alvarez, B. Fellenz +6
The latest generation of IPMs installed in the Fermilab Main Injector and Recycler incorporate a 1 kG permanent magnet, a newly designed high-gain, rad-tolerant preamp, and a contr…
Status of the warm front end of PXIE
A. Shemyakin, M. Alvarez, R. Andrews +10
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a mac…