1 citations · 1 across the 2 of their papers we have counts for
2 papers
physics.acc-ph2025
Beam-commissioning-oriented optics study of HFRS Phase-I based on measured magnetic field data
Ke Wang, Li-Na Sheng, Xue-Heng Zhang +14
The construction of the first phase of the High energy FRagment Separator (HFRS Phase-I) has already been completed and it is anticipated to start beam commissioning in autumn 2025…
physics.ins-det2015★ 1 cited
Structural analysis of superconducting dipole prototype for HIAF
Xiaoying Zhang, Beimin Wu, Dongsheng Ni +3
The High Intensity Heavy-Ion Accelerator Facility is a new project in the Institute of Modern Physics. The dipole magnets of all rings are conceived as fast cycled superconducting…