2 papers
physics.acc-ph2022
Operation of the H- Linac at FNAL
K. Seiya, T. Butler, D. Jones +11
The Fermi National Accelerator Laboratory (FNAL) Linac has been in operation for 52 years. In approximately four years, it will be replaced by a new 800 MeV superconducting machine…
physics.acc-ph2015
Design of a Marx-Topology Modulator for FNAL Linac
T. A. Butler, F. G. Garcia, M. R. Kufer +2
The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The…