3 papers
physics.acc-ph2025
High-precision Beam Optics Calculation of the HIAF-BRing Using Measured Fields
Ke Wang, Li-Na Sheng, Geng Wang +5
The construction of the High Intensity heavy ion Accelerator Facility (HIAF) has been completed, with current efforts focused on subsystem commissioning. Beam commissioning is sche…
physics.acc-ph2025
A further study on the high-precision optics for HIAF-BRing
Ke Wang, Li-Na Sheng, Tao Li +6
The High Intensity heavy ion Accelerator Facility (HIAF) successfully accelerated the 18O6+ beam on October 27, 2025. This paper presents a further simulation study on the high-pre…
physics.acc-ph2025
Beam-commissioning-oriented optics study of HFRS Phase-I based on measured magnetic field data
Ke Wang, Li-Na Sheng, Xue-Heng Zhang +14
The construction of the first phase of the High energy FRagment Separator (HFRS Phase-I) has already been completed and it is anticipated to start beam commissioning in autumn 2025…