4 papers
High-precision Beam Optics Calculation of the HIAF-BRing Using Measured Fields
Ke Wang, Li-Na Sheng, Geng Wang +5
The construction of the High Intensity heavy ion Accelerator Facility (HIAF) has been completed, with current efforts focused on subsystem commissioning. Beam commissioning is sche…
A further study on the high-precision optics for HIAF-BRing
Ke Wang, Li-Na Sheng, Tao Li +6
The High Intensity heavy ion Accelerator Facility (HIAF) successfully accelerated the 18O6+ beam on October 27, 2025. This paper presents a further simulation study on the high-pre…
Beam-commissioning-oriented optics study of HFRS Phase-I based on measured magnetic field data
Ke Wang, Li-Na Sheng, Xue-Heng Zhang +14
The construction of the first phase of the High energy FRagment Separator (HFRS Phase-I) has already been completed and it is anticipated to start beam commissioning in autumn 2025…
The enhanced X-ray Timing and Polarimetry mission -- eXTP for launch in 2030
Shuang-Nan Zhang, Andrea Santangelo, Yupeng Xu +155
In this paper we present the current status of the enhanced X-ray Timing and Polarimetry mission, which has been fully approved for launch in 2030. eXTP is a space science mission…