2 papers
physics.acc-ph2026
Heat load measurements for the PIP-II pHB650 cryomodule
D. Porwisiak, M. J. White, V. Roger +11
Phase-3 testing of the pHB650 cryomodule at the PIP-II Injector Test Facility was conducted to evaluate the effectiveness of heat load mitigations performed after earlier phases of…
physics.acc-ph2025
Integration and commissioning plan of Full Flow Purifier at Muon Campus
J. Subedi, T. Tope, B. Hansen +5
The Full Flow Purifier for Fermilab's Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineeri…