Maintenance Duration Estimate for a DEMO Fusion Power Plant, based on the EFDA WP12 pre-conceptual studies
O. Crofts, J. Harman
The erosion and high neutron flux in a fusion power plant results in the need for frequent remote replacement of the plasma facing components. This is a complex and time consuming…
Status of ITER neutral beam cell remote handling system
N Sykes, C Belcher, C-H Choi +9
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. Though manual maintenance work is envisaged within…
Applying Remote Handling Attributes to the ITER Neutral Beam Cell Monorail Crane
O Crofts, P Allan, J Raimbach +4
The maintenance requirements for the equipment in the ITER Neutral Beam Cell requires components to be lifted and transported within the cell by remote means. To meet this requirem…
Pre-conceptual Design Assessment of DEMO Remote Maintenance
A. Loving, O. Crofts, N. Sykes +9
EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a…