30 citations · 30 across the 1 of their papers we have counts for
3 papers
Proposal for the ILC Preparatory Laboratory (Pre-lab)
International Linear Collider International Development Team
During the preparatory phase of the International Linear Collider (ILC) project, all technical development and engineering design needed for the start of ILC construction must be c…
Path to AWAKE: Evolution of the concept
A. Caldwell, E. Adli, L. Amorim +118
This report describes the conceptual steps in reaching the design of the AWAKE experiment currently under construction at CERN. We start with an introduction to plasma wakefield ac…
Present status and first results of the final focus beam line at the KEK Accelerator Test Facility
P. Bambade, M. Alabau Pons, J. Amann +91
ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam…