106 citations · 125 across the 8 of their papers we have counts for
Showing 2018Show all
3 papers · 1 filter
physics.acc-ph2018★ 4 cited
PIP-II Injector Test Warm Front End: Commissioning Update
L. Prost, R. Andrews, C. Baffes +19
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…
physics.acc-ph2018★ 2 cited
Commissioning And First Results From The Fermilab Cryomodule Test Stand
E. R. Harms, M. Awida, C. Baffes +34
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cool…
physics.acc-ph2018
Automatic phase calibration for RF cavities using beam-loading signals
J. P. Edelen, B. E. Chase
Precise calibration of the cavity phase signals is necessary for the operation of any particle accelerator. For many systems this requires human in the loop adjustments based on me…