physics.acc-ph2018
Commissioning and Operation of FAST Electron Linac at Fermilab
A. Romanov, C. Baffes, D. R. Broemmelsiek +17
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST)…
physics.acc-ph2018
PIP-II Injector Test Warm Front End: Commissioning Update
L. Prost, R. Andrews, C. Baffes +19
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…
physics.acc-ph2018
Status of the warm front end of PIP-II injector test
A. Shemyakin, M. Alvarez, R. Andrews +15
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF…