2 citations · 2 across the 3 of their papers we have counts for
6 papers · 1 filter
Experience with Long-pulse Operation of the PIP2IT Warm Front End
A. Shemyakin, J. -P. Carneiro, A. Chen +10
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) lin…
Commissioning and Operation of FAST Electron Linac at Fermilab
A. Romanov, C. Baffes, D. R. Broemmelsiek +17
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST)…
PIP-II Injector Test Warm Front End: Commissioning Update
L. Prost, R. Andrews, C. Baffes +19
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…
Status of the warm front end of PIP-II injector test
A. Shemyakin, M. Alvarez, R. Andrews +15
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF…
Cryogenic loss monitors with FPGA TDC signal processing
A. Warner, J. Wu
Radiation hard helium gas ionization chambers capable of operating in vacuum at temperatures ranging from 5K to 350K have been designed, fabricated and tested and will be used insi…
Development of a machine protection system for the Superconducting Beam Test Facility at Fermilab
A. Warner, L. Carmichael, M. Church +1
Fermilab's Superconducting RF Beam Test Facility currently under construction will produce electron beams capable of damaging the acceleration structures and the beam line vacuum c…