3 citations · 3 across the 3 of their papers we have counts for
Showing physics.acc-phShow all
3 papers · 1 filter
physics.acc-ph2012
ACSYS in a box
C. Briegel, D. Finstrom, B. Hendricks +9
The Accelerator Control System at Fermilab has evolved to enable this relatively large control system to be encapsulated into a "box" such as a laptop. The goal was to provide a pl…
physics.acc-ph2012★ 3 cited
Status and Plans for an SRF Accelerator Test Facility at Fermilab
M. Church, J. Leibfritz, S. Nagaitsev
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration sect…
physics.acc-ph2012
Status and plans for a SRF accelerator test faciliy at Fermilab
J. Leibfritz, R. Andrews, K. Carlson +13
A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will…