3 citations · 3 across the 2 of their papers we have counts for
2 papers
physics.acc-ph2012
ACSYS in a box
C. Briegel, D. Finstrom, B. Hendricks +9
The Accelerator Control System at Fermilab has evolved to enable this relatively large control system to be encapsulated into a "box" such as a laptop. The goal was to provide a pl…
physics.acc-ph2012★ 3 cited
Tevatron Beam Position Monitor Upgrade
G. Annala, B. Banerjee, B. Barker +24
This paper describes the development of a digital-based Beam Position System which was designed, developed, and adapted for the Tevatron during Collider Run II.