122 citations · 161 across the 7 of their papers we have counts for
4 papers · 1 filter
Quench Performance of the First Pre-series AUP Cryo-assembly
M. Baldini, G. Chlachidze, G. Apollinari +9
The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-L…
Development and Test of a Large-aperture Nb3Sn Cos-theta Dipole Coil with Stress Management
I. Novitski, A. V. Zlobin, M. Baldini +4
The design concept of the Electron Ion Collider (EIC), which is under construction at BNL, considers adding a 2nd Interaction Region (IR) and detector to the machine after completi…
Status of the High Field Cable Test Facility at Fermilab
G. V. Velev, D. Arbelaez, C. Arcola +11
Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing super…
Commissioning And First Results From The Fermilab Cryomodule Test Stand
E. R. Harms, M. Awida, C. Baffes +34
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cool…