most citedDesign and testing of the New Muon Lab cryogenic system at Fermilab

8 citations · 19 across the 8 of their papers we have counts for

collaborators

8 papers

physics.acc-ph2013

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

J. Leibfritz, R. Andrews, C. M. Baffes +13

The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerat…

physics.acc-ph20121 cited

Dynamic PID loop control

L. Pei, A. Klebaner, J. Theilacker +5

The Horizontal Test Stand (HTS) SRF Cavity and Cryomodule 1 (CM1) of eight 9-cell, 1.3GHz SRF cavities are operating at Fermilab. For the cryogenic control system, how to hold liqu…

physics.acc-ph20125 cited

RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

E. Harms, K. Carlson, B. Chase +22

Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the…

physics.acc-ph20123 cited

Status and Plans for an SRF Accelerator Test Facility at Fermilab

M. Church, J. Leibfritz, S. Nagaitsev

A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration sect…

physics.acc-ph2012

Fermilab SRF cryomodule operational experience

A. Martinez, A. L. Klebaner, J. C. Theilacker +3

Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the init…

physics.acc-ph2012

Status and plans for a SRF accelerator test faciliy at Fermilab

J. Leibfritz, R. Andrews, K. Carlson +13

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will…