Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab
J. Leibfritz, R. Andrews, C. M. Baffes +13
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerat…
Mu2e Conceptual Design Report
The Mu2e Project, Collaboration, : +225
Mu2e at Fermilab will search for charged lepton flavor violation via the coherent conversion process mu- N --> e- N with a sensitivity approximately four orders of magnitude better…
Dynamic PID loop control
L. Pei, A. Klebaner, J. Theilacker +5
The Horizontal Test Stand (HTS) SRF Cavity and Cryomodule 1 (CM1) of eight 9-cell, 1.3GHz SRF cavities are operating at Fermilab. For the cryogenic control system, how to hold liqu…
RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility
E. Harms, K. Carlson, B. Chase +22
Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the…
Status and Plans for an SRF Accelerator Test Facility at Fermilab
M. Church, J. Leibfritz, S. Nagaitsev
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration sect…
Fermilab SRF cryomodule operational experience
A. Martinez, A. L. Klebaner, J. C. Theilacker +3
Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the init…