5 citations · 7 across the 4 of their papers we have counts for
Showing 2012Show all
2 papers · 1 filter
physics.acc-ph2012
ACSYS in a box
C. Briegel, D. Finstrom, B. Hendricks +9
The Accelerator Control System at Fermilab has evolved to enable this relatively large control system to be encapsulated into a "box" such as a laptop. The goal was to provide a pl…
physics.acc-ph2012★ 5 cited
RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility
E. Harms, K. Carlson, B. Chase +22
Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the…