23 citations · 30 across the 5 of their papers we have counts for
4 papers · 1 filter
PIP-II Injector Test Warm Front End: Commissioning Update
L. Prost, R. Andrews, C. Baffes +19
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…
Commissioning And First Results From The Fermilab Cryomodule Test Stand
E. R. Harms, M. Awida, C. Baffes +34
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cool…
Adaptive beam loading compensation in room temperature bunching cavities
J. P. Edelen, B. E. Chase, E. Cullerton +1
In this paper we present the design, simulation, and proof of principle results of an optimization based adaptive feed-forward algorithm for beam-loading compensation in a high imp…
Low Level RF Control for the PIP-II Accelerator
J. P. Edelen, B. E. Chase, E. Cullerton +9
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINA…