Test Results of PIP2IT MEBT Vacuum Protection System
A. Chen, R. Andrews, C. Baffes +4
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities…
Commissioning and Operation of FAST Electron Linac at Fermilab
A. Romanov, C. Baffes, D. R. Broemmelsiek +17
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST)…
PIP-II Injector Test Warm Front End: Commissioning Update
L. Prost, R. Andrews, C. Baffes +19
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…
Commissioning And First Results From The Fermilab Cryomodule Test Stand
E. R. Harms, M. Awida, C. Baffes +34
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cool…
Status of the warm front end of PIP-II injector test
A. Shemyakin, M. Alvarez, R. Andrews +15
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF…
High power density test of PXIE MEBT absorber prototype
A. Shemyakin, C. Baffes
One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an…