activity
20132019
most citedDesign of MEBT for the Project X Injector Experiment at Fermilab

9 citations · 9 across the 2 of their papers we have counts for

collaborators

5 papers

physics.acc-ph2019

Experience with Long-pulse Operation of the PIP2IT Warm Front End

A. Shemyakin, J. -P. Carneiro, A. Chen +10

The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) lin…

physics.acc-ph2018

PIP-II Injector Test Warm Front End: Commissioning Update

L. Prost, R. Andrews, C. Baffes +19

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-lo…

physics.acc-ph2018

Low Emittance Growth in a LEBT with Un-Neutralized Section

L. Prost, J. -P. Carneiro, A. Shemyakin

In a Low Energy Beam Transport line (LEBT), the emittance growth due to the beam's space charge is typically suppressed by way of neutralization from either electrons or ions, whic…

physics.acc-ph2015

Scheme for Low Energy Beam Transport with a non-neutralized section

A. Shemyakin, L. Prost

A typical Low Energy Beam Transport (LEBT) design relies on dynamics with nearly complete beam space charge neutralization over the entire length of the LEBT. This paper argues tha…

physics.acc-ph20139 cited

Design of MEBT for the Project X Injector Experiment at Fermilab

A. Shemyakin, C. Baffes, A. Chen +16

The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of…