104 citations · 146 across the 17 of their papers we have counts for
5 papers · 1 filter
RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility
E. Harms, K. Carlson, B. Chase +22
Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the…
Status and Plans for an SRF Accelerator Test Facility at Fermilab
M. Church, J. Leibfritz, S. Nagaitsev
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration sect…
Status and plans for a SRF accelerator test faciliy at Fermilab
J. Leibfritz, R. Andrews, K. Carlson +13
A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will…
Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab
M. W. McGee, J. Leibfritz, A. Martinez +2
The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the…
Design and testing of the New Muon Lab cryogenic system at Fermilab
A. Martinez, A. L. Klebaner, J. C. Theilacker +2
Fermi National Accelerator Laboratory is constructing a superconducting 1.3 GHz cryomodule test facility located at the New Muon Lab building. The facility will be used for testing…