most citedDesign and testing of the New Muon Lab cryogenic system at Fermilab

8 citations · 20 across the 9 of their papers we have counts for

collaborators
Showing physics.acc-phShow all

9 papers · 1 filter

physics.acc-ph2013

The Advanced Superconducting Test Accelerator (ASTA) at Fermilab: A User-Driven Facility Dedicated to Accelerator Science \& Technology

P. Piot, V. Shiltsev, S. Nagaitsev +4

Fermilab is currently constructing a superconducting electron linac that will eventually serve as the backbone of a user-driven facility for accelerator science. This contribution…

physics.acc-ph20132 cited

Test Results of Tesla-Style Cryomodules at Fermilab

E. Harms, K. Carlson, B. Chase +13

Commissioning and operation of the first Tesla-style Cryomodule (CM-1) at Fermilab was concluded in recent months. A second Tesla Type III+ module, RFCA002, will be replacing it. C…

physics.acc-ph2013

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

J. Leibfritz, R. Andrews, C. M. Baffes +13

The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerat…

physics.acc-ph2013

Mechanical Design of a High Energy Beam Absorber for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab

C. Baffes, M. Church, J. Leibfritz +2

A high energy beam absorber has been built for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab. In the facility's initial configuration, an electron beam will be a…

physics.acc-ph20125 cited

RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

E. Harms, K. Carlson, B. Chase +22

Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the…

physics.acc-ph20123 cited

Status and Plans for an SRF Accelerator Test Facility at Fermilab

M. Church, J. Leibfritz, S. Nagaitsev

A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration sect…