29 citations · 45 across the 3 of their papers we have counts for
3 papers
physics.ins-det2015★ 4 cited
Construction and commissioning of a technological prototype of a high-granularity semi-digital hadronic calorimeter
G. Baulieu, M. Bedjidian, K. Belkadhi +43
A large prototype of 1.3m3 was designed and built as a demonstrator of the semi-digital hadronic calorimeter (SDHCAL) concept proposed for the future ILC experiments. The prototype…
physics.ins-det2009★ 29 cited
Stand-alone Cosmic Muon Reconstruction Before Installation of the CMS Silicon Strip Tracker
CMS Tracker Collaboration
The subsystems of the CMS silicon strip tracker were integrated and commissioned at the Tracker Integration Facility (TIF) in the period from November 2006 to July 2007. As part of…
physics.ins-det2009★ 12 cited
Performance studies of the CMS Strip Tracker before installation
CMS Tracker Collaboration
In March 2007 the assembly of the Silicon Strip Tracker was completed at the Tracker Integration Facility at CERN. Nearly 15% of the detector was instrumented using cables, fiber o…