19 citations · 45 across the 4 of their papers we have counts for
4 papers · 1 filter
First results of the new endcap TOF commissioning at BESIII
Zhi Wu, Shengsen Sun, Yuekun Heng +23
The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished…
The upgrade system of BESIII ETOF with MRPC technology
Xiaozhuang Wang, Yongjie Sun, Cheng Li +14
The Beijing Spectrometer III (BESIII) endcap Time-Of-Filght (ETOF) was proposed to upgrade with Multigap Resistive Plate Chamber (MRPC) technology to substitute the current ETOF of…
The cosmic ray test of MRPCs for the BESIII ETOF upgrade
Xiaozhuang Wang, Yuekun Heng, Zhi Wu +20
In order to improve the particle identification capability of the Beijing Spectrometer III (BESIII),t is proposed to upgrade the current endcap time-of-flight (ETOF) detector with…
Prototype of time digitizing system for BESIII endcap TOF upgrade
Cao Ping, Sun Wei-Jia, Ji Xiao-Lu +4
The prototype of time digitizing system for the upgrade of BESIII endcap TOF (ETOF) is introduced in this paper. The ETOF readout electronics has a formation of distributed archite…