20 citations · 23 across the 2 of their papers we have counts for
2 papers
hep-ex2022★ 3 cited
PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac
M. Toups, R. G. Van de Water, Brian Batell +27
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-w…
hep-ph2021★ 20 cited
General Kinetic Mixing in Gauged Model for Muon and Dark Matter
Timothy Hapitas, Douglas Tuckler, Yue Zhang
The gauged extension of the Standard Model is a very simple framework that can alleviate the tension in muon anomalous magnetic dipole moment, reinforced by the re…