3 citations · 6 across the 2 of their papers we have counts for
2 papers
physics.acc-ph2022★ 3 cited
Irradiation Facilities and Irradiation Methods for High Power Target
F. Pellemoine, C. Barbier, Y. Sun +38
High Power Target systems are key elements in future neutrino and other rare particle production in accelerators. These systems transform an intense source of protons into secondar…
hep-ex2022★ 3 cited
PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac
M. Toups, R. G. Van de Water, Brian Batell +27
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-w…