activity
20102022
most citedA New Approach for Measuring the Muon Anomalous Magnetic Moment and Electric Dipole Moment

6 citations · 14 across the 4 of their papers we have counts for

collaborators

6 papers

physics.ins-det20224 cited

Measurement of the cluster position resolution of the Belle II Silicon Vertex Detector

R. Leboucher, K. Adamczyk, L. Aggarwal +78

The Silicon Vertex Detector (SVD), with its four double-sided silicon strip sensor layers, is one of the two vertex sub-detectors of Belle II operating at SuperKEKB collider (KEK,…

physics.ins-det20204 cited

Performance evaluation of the aerogel RICH counter for the Belle II spectrometer using early beam collision data

M. Yonenaga, I. Adachi, L. Burmistrov +32

The Aerogel Ring Imaging Cherenkov (ARICH) counter serves as a particle identification device in the forward end-cap region of the Belle II spectrometer. It is capable of identifyi…

physics.ins-det2019

Performance evaluation of a silicon strip detector for positrons/electrons from a pulsed a muon beam

T. Aoyagi, Y. Honda, H. Ikeda +26

A high-intensity pulsed muon beam is becoming available at the at the Japan Proton Accelerator Research Complex (J-PARC). Many experiments to study fundamental physics using this h…

physics.ins-det2019

Construction and quality assurance of the Belle II Silicon Vertex Detector

P. K. Resmi

The Belle II experiment, which is situated at the interaction point of the SuperKEKB collider at KEK, Tsukuba, Japan, is expected to collect data corresponding to an int…

physics.ins-det20196 cited

A New Approach for Measuring the Muon Anomalous Magnetic Moment and Electric Dipole Moment

M. Abe, S. Bae, G. Beer +93

This paper introduces a new approach to measure the muon magnetic moment anomaly , and the muon electric dipole moment (EDM) at the J-PARC muon facility. The g…

physics.ins-det2010

Belle II Technical Design Report

T. Abe, I. Adachi, K. Adamczyk +407

The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under constructi…