122 citations · 132 across the 5 of their papers we have counts for
4 papers · 1 filter
Final Design Of The Pre-production SSR2 Cryomodule For PIP-II Project At Fermilab
J. Bernardini, D. Passarelli, V. Roger +10
The present contribution reports the design of the pre-production Single Spoke Resonator Type 2 Cryomodule (ppSSR2 CM), developed in the framework of the PIP-II project at Fermilab…
200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab
T. Arkan, J. Kaluzny, D. Bafia +11
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase;…
First high power pulsed tests of a dressed 325 MHz superconducting single spoke resonator at Fermilab
R. Madrak, J. Branlard, B. Chase +18
In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, β=0.22 superconducting single-spoke resonator (SSR1) has been tested for the fir…
First high gradient test results of a dressed 325 MHz superconducting single spoke resonator at Fermilab
R. C. Webber, T. Khabiboulline, R. Madrak +4
A new superconducting RF cavity test facility has been commissioned at Fermilab in conjunction with first tests of a 325 MHz, β = 0.22 superconducting single-spoke cavity dressed w…